Mining Engineering |
Environmental Engineering |
Petroleum Engineering |
Geology |
Hidrogeology |
Geotechnics |
Geophysics |
Regional geology |
Istraživanje ležišta mineralnih sirovina |
Mining Engineering |
Environmental Engineering |
Petroleum Engineering |
Geology |
Hidrogeology |
Geotechnics |
Geophysics |
Mining Engineering |
Environmental Engineering |
Petroleum Engineering |
Geology |
Hidrogeology |
Geotechnics |
Geophysics |
V year | |||||
Name of subjects | IX semester | X semester | ECTS | The status | Professor |
Course/ Subject of Elective Bl9 | 2 +2 | ||||
Course/ Subject of Elective Bl10 | 2 +2 | ||||
Course/ Subject of Elective Bl11 | 2 +2 | ||||
Course/ Subject of Elective Bl12 | 2 +2 | ||||
Course/ Subject of Elective Bl13 | 2 +2 | ||||
Course/ Subject of Elective Bl14 | 2 +2 | ||||
Course/ Subject of Elective Bl15 | 2 +2 | ||||
Course/ Subject of Elective Bl16 | 2 +2 | ||||
Graduation Thesis/Diploma Thesis | 0 +0 +8 | 12 | Compulsory | ||
Elective Block9 | IX semester | X semester | ECTS | The status | Professor |
Database | 2 +2 | 6 | Optional | ||
Economic Evaluation of Mine | 2 +2 | 6 | Optional | ||
Methodology of Scientific Research | 2 +2 | 6 | Optional | ||
Elective Block10 | IX semester | X semester | ECTS | The status | Professor |
Selected Topics in Mathematics | 2 +2 | 6 | Optional | ||
Materials Supply and Transport of Workers | 2 +2 | 6 | Optional | ||
Optimization of Underground Production Systems | 2 +2 | 6 | Optional | ||
Elective Block11 | IX semester | X semester | ECTS | The status | Professor |
Field Research Methods of Rock Mass | 2 +2 | 6 | Optional | ||
Hoisting in shafts and Drifts | 2 +2 | 6 | Optional | ||
Development of Underground Infrastructure | 2 +2 | 6 | Optional | ||
Elective Block12 | IX semester | X semester | ECTS | The status | Professor |
Geostatistical modelling of mineral deposits | 2 +2 | 6 | Optional | ||
State of Stress in Rock massifs | 2 +2 | 6 | Optional | ||
Elective Block13 | IX semester | X semester | ECTS | The status | Professor |
Optimization of parameters for Shortwall Methods | 2 +2 | 6 | Optional | ||
Special Systems for Loading and Haulage in the Underground Mining | 2 +2 | 6 | Optional | ||
Elective Block14 | IX semester | X semester | ECTS | The status | Professor |
Modeling Testing of Mining Methods Parameters | 2 +2 | 6 | Optional | ||
Design of Mine Ventilation | 2 +2 | 6 | Optional | ||
Mechanized Equipment for Sidewise Support of Excavated Space and Underground Facilities | 2 +2 | 6 | Optional | ||
Elective Block15 | IX semester | X semester | ECTS | The status | Professor |
Optimization of parameters for Longwall Methods | 2 +2 | 6 | Optional | ||
Management System in Work Safety | 2 +2 | 6 | Optional | ||
Project Management in the Underground Mining 2 | 2 +2 | 6 | Optional | ||
Elective Block16 | IX semester | X semester | ECTS | The status | Professor |
Ground control | 2 +2 | 6 | Optional | ||
Stability of Underground Roadways and Objects | 2 +2 | 6 | Optional | ||
Selected Topics of Operational Research | 2 +2 | 6 | Optional | ||
University of Belgrade |
KoBSON Library Service |
COBISS online catalog |
Career Development Center |
Technology Transfer Center |
Center for Students with Disabilities |